#266149 - 28/09/2005 12:11 Online Machine SHop - Fabrication plant?
TankheaD
new poster

Registered: 30/10/2004
Posts: 21
Loc: MaryLand , USA
Maybe this is is old news here, but I ran across this in Wired 13.09 ...

Free CAD program, submit to shop, select quantity & material and they fabricate and deliver. Maybe something to think of for the handle replacement job?

www.emachineshop.com

Mark
_________________________
TankheaD
Rio MkIIa (plus PCATS tuner) - 120Gb - green with lighted Greenlights smoke buttons!
JL 300/4 (Polk Audio fr & rr) - JL 250/1 (Polk Momo 8" sw)

Top
#266150 - 28/09/2005 12:20 Re: Online Machine SHop - Fabrication plant? [Re: TankheaD]
wfaulk
carpal tunnel

Registered: 25/12/2000
Posts: 16706
Loc: Raleigh, NC US
It was mentioned over here pretty recently and commented on as being very expensive.
_________________________
Bitt Faulk

Top
#266151 - 28/09/2005 15:41 Re: Online Machine SHop - Fabrication plant? [Re: wfaulk]
Ezekiel
pooh-bah

Registered: 25/08/2000
Posts: 2413
Loc: NH USA
I've not read the links, but as a machine tool designer I can tell you that almost all custom 1-off/short-run machine work is very expensive, and is even more expensive if you need the parts ASAP/immediately. A typical low volume lead time is 3-4 weeks ARO.

-Zeke
_________________________
WWFSMD?

Top
#266152 - 29/09/2005 08:58 Re: Online Machine SHop - Fabrication plant? [Re: Ezekiel]
schofiel
carpal tunnel

Registered: 25/06/1999
Posts: 2993
Loc: Wareham, Dorset, UK
Well, they are very rapid - check their promised turn-round times - and are excellent for prototyping where the cost is not important (!). However, their costs are not excessive - just high.
_________________________
One of the few remaining Mk1 owners... #00015

Top
#266153 - 03/10/2005 00:22 Re: Online Machine SHop - Fabrication plant? [Re: schofiel]
FireFox31
pooh-bah

Registered: 19/09/2002
Posts: 2494
Loc: East Coast, USA
All those guys which claim "rapid tooling" and other quick production (non-prototype) are far understating their turn-around times. At least for me they were. The rapid tooling and rapid injection molding processes seem clever on paper, but none of the manufacturers were willing to offer them for the button project. Ah, it was probably the small part details.