Bare in mind that the APC UPS selector typically over estimates power requirement quite a bit. My two servers run 30 minutes or so on my APC UPS that was speced to run for 5 minutes...

...and there is a router and a switch running on there as well that I didn't even tell the APC UPS selector about.
_________________________
Remind me to change my signature to something more interesting someday